
COMPUTER

S C I E N C E
Infrastructure Facilities
Infrastructure is an essential feature of an education system.The Department of Computer Science is well equipped with all the learning resources like computers, smart class rooms(OHP & LCD),Original Softwares and Books and Journals.
The facilities are listed below.
• State of the Art Computer Lab with latest configuration Computers and
supported by 12.5KVA Uninterrupted Power Supply Unit.
• The Lab is equipped with original softwares and High Resolution Printers
and Scanner.
• Computer based tutorials to facilitate self-learning of New Computer
Languages and technologies.
• Centralized Air Conditioner.
• Safety is ensured with Fire Extinguishers.
• Highly equipped Digital and Microprocessor Lab.
• Sufficient Text and Reference books in the library.
• Technology based teaching aids – (OHP,LCD,LED TV) are available.
• Separate Hardware lab for training students in Computer Assembling and Troubleshooting
through UGC Sponsored Certificate and Diploma Courses.
Laboratories Details:
1. Computer Lab
2. Hardware lab
1. Computer Lab Details TOTAL NO.OF SYSTEMS-53
A. CONFIGURATION OF THE SERVER-1
-
Windows Server 2008 R2 Enterprise - Environment.
-
IBM Server X330 M4.
-
Intel Xeon E5 2407 (Quad Core.) / 2.20Ghz Processor.
-
10MB Cache Memory 1066MHz Memory Speed.
-
DDR3 Memory 8GB, 64 bit Operating System.
-
1*300GB SAS 10K RPM and 2.5’ Hot Swap Harddrive.
-
Multi Burner Optical DVD RW.
-
RAID 01 in –built(M1115 Card).
B. NODE CONFIGURATION
System Nos.:50
-
Environment - Windows XP
-
Processor - Intel Core i3-3220
-
Speed of the Processor - 3.30 Ghz
-
RAM - 4 GB
-
Hard Disk - SATA Hard Disk 500 GB
-
Monitor -18.5”TFTLenovoMonitor
-
Keyboard -IBM Lenovo Keyboard
-
Mouse -IBM Lenovo Optical Scroll Mouse
-
DVD Writer
System Nos.: 3 (Wireless)
-
Lenovo All in One
-
Intel core i5 4th Generation Processor
-
Intel H81 Chipset motherboard
-
DDR3 Memory 4GB, 500GB Harddisk, DVD RW
-
Lenovo Keyboard & Lenovo Optical mouse
-
Lenovo 19.5 LED Monitor, DOS
C. PRINTERS
-
HP Laser Jet 1020 – 1
-
Canon PIXMA MP287 – 1(Inkjet Photo All-in-one)
-
HP Laserjet Pro MFP M126nw- Print, Scan, Xerox - 1
D. UPS (Uninterrupted Power Supply)
-
UPS – I
-
Capacity – 7.5 KVA
-
Backup – 1 Hr.
-
-
UPS – II
-
Capacity – 10 KVA
-
Backup – 1 Hr.
-
-
Server UPS
-
Numeric 1KVA UPS
-
E. LED TV
-
Samsung LFD DBD 55” Large Format Display – in Lab.
-
LCD Projector and Interactive Board for Smart Class – B8, B9 & B10 class rooms.
2. Hardware lab
-
Hardware Components and 7 Systems for assembling is available.
-
LCD and OHP for the Department is available and is installed in B10.
II. Original Software List
-
Microsoft Visual Studio 6.0 Professional Edition.
-
Microsoft Visual C++ 6.0 Professional Edition.
-
Novell-Intranetware for Small Business.
-
Microsoft Visual Basic 6.0
-
Microsoft Windows 2000 professional.
-
Microsoft Windows NT Server
-
McAfee Anti Virus
-
The Norton Anti Virus
III. Books and Journals
-
Total no. of books in Computer Science - 2659
-
Total Journals - 4
-
Total no. of educational CD’s - 288



